Advanced QT3-20 Automatic Block Paver Machine
High Production Efficiency
This advanced automatic brick making machine from China boasts a highly efficient production cycle of just 15 seconds. With the ease of a start button press, production efficiency is maximized, reducing labor costs. The machine can produce between 5,000 to 30,000 bricks within an 8-hour shift.
Advanced Technology
Utilizing German vibration technology and the latest hydraulic systems, this brick making machine ensures blocks of superior quality and density. The state-of-the-art welding and heat treatment processes provide durability and longevity for the molds. Line cutting technology guarantees precise dimensions for each brick.
Innovative Design Features
- Hyperbolic arm feeding system
- Double synchronous shaft
- 4-cylinder efficient and accurate distribution system
- Air bag damping system to minimize noise and extend machine life
Machine Specifications
- Pallet Size: 750x550mm
- Qty/mold: 3 pcs (400x200x200mm)
- Host Machine Power: 27kw
- Molding cycle: 15-20 seconds
- Molding method: Vibration + Hydraulic pressure
- Host Machine Size: 3580x1950x2600mm
- Host Machine Weight: 3000kg
- Raw materials: Cement, crushed stones, sand, stone powder, slag, fly ash, construction waste, etc.
Production Capabilities
- 400x200x200mm Hollow Block: 3 pcs per mold, 540-720 pcs/hour, 5760-7680 pcs/8 hours
- 400x150x200mm Hollow Block: 4 pcs per mold, 720-960 pcs/hour, 5760-7680 pcs/8 hours
- 240x110x70mm Solid Brick: 16 pcs per mold, 2880-3840 pcs/hour, 23040-30720 pcs/8 hours
- 200x100x60mm Holland Paver: 12 pcs per mold, 1278-2880 pcs/hour, 13824-23040 pcs/8 hours
- 225x112.5x60mm Zigzag Paver: 10 pcs per mold, 1440-2400 pcs/hour, 11520-19200 pcs/8 hours
FAQs
- What types of bricks can your machines produce? Our machines can manufacture a variety of bricks by changing molds, including hollow blocks, solid blocks, pavers, hourdis bricks, curbstones, and colored bricks. Customization is also available.
- How soon can I receive the machine? Production and shipping take approximately 20-40 days after receiving the original L/C from our bank, and the vessel will take around 40 days from Qingdao to Ethiopia. Installation requires about 30 days, totaling approximately 90-110 days.
- Can your engineer assist with installation? Yes, our engineers can travel to your location to install the machine and provide training for your staff on operation and maintenance.
